
Gap in the schedule

Sealed on schedule
9 days
Spec to site
Industrial Glass Supply — Cut to Order
Borosilicate. Tempered. Laminated.
Warehouse-direct glass for contractors, glazing subs, and architects who can't wait six weeks for the wrong cut.
"Six weeks? My window rough-in closes in ten days."
Industry standard lead times assume you have flexibility. You don't. A curtain wall panel on back-order doesn't just delay glazing — it holds the HVAC rough-in, the drywall, and the CO. One glass supplier's schedule becomes everyone's problem.
Warehouse stock. In-house cutting. Our truck, not a freight broker's.
We carry 400,000 sq ft of flat stock across tempered, laminated, insulated, and borosilicate lites. No outsourced cutting, no third-party logistics. Your order goes from our CNC to our flatbed to your site. The 9-day clock starts when you submit the cut list.
9 days
Avg. spec to site
400K sq ft
Warehouse stock
48 hrs
Cut turnaround
3 routes
Daily delivery runs
"The flatbed showed up and nothing fit."
Wrong cuts mean two things: a jobsite standing still and a subcontractor eating the reorder cost. Glass that arrives ⅛" off a custom opening doesn't get shimmed in — it goes back, and your schedule bleeds a week.
CNC-verified cuts. Guaranteed tolerances. Recourse if we miss.
Every sheet runs through optical verification before it loads. If a cut is outside tolerance, we recut and redeliver at our cost — no claims process, no back-and-forth. Your foreman calls, we fix it.

100%
Recut guarantee
"Which glass do I actually need?"
The spec sheet says "safety glazing." The architect's note says "low-iron." The inspector wants documentation you don't have. We cut through the confusion.
Tempered Safety
95%
For curtain walls, storefronts, and anywhere code demands safety glazing.
- —4× stronger than annealed
- —Shatters into pebbles, not shards
- —CPSC 16 CFR 1201 compliant
- —Available ⅛" to ¾" thickness
Laminated Safety
88%
PVB or SGP interlayer bonds two lites — glass stays in frame on impact.
- —Hurricane & blast resistance
- —UV blocking up to 99%
- —Sound attenuation: up to STC 40
- —School retrofit standard
Insulated Glass Units
91%
Two or three lites sealed with argon or krypton fill. Thermal performance, documented.
- —U-values from 0.19 to 0.31
- —Argon or krypton fill
- —Low-E coatings available
- —Dual or triple pane
Borosilicate
78%
Lab-grade thermal resistance. The glass that stays flat when the autoclave runs.
- —Thermal expansion: 3.3 × 10⁻⁶/°C
- —Max continuous temp: 500°C
- —Chemical resistance: Class 1
- —ASTM E1512 compliant
Not ready to quote yet?
Download our full spec sheet — glass types, coatings, tolerances, and compliance stamps in one PDF.